Hi Mick
Many thanks for the welcome, it's greatly appreciated. I understand your comments regarding the membership, and I will bare this in mind. I have a long road to travel with regards to developing, let alone running, my OO garden railway. Still, hopefully time doesn't currently appear to be to greater a factor for me. I appreciate your comments with regards to Ops, and I was pretty much thinking similar. However, I do like things a little on the elaborate/moderately complex side!
My current plan is a phased build, finally ending up with a Y formation layout. Each branch is likely to have a covered loop and fiddle yard, which will have grade separation access. The space in question is perhaps 20m x 8m, I should mention that the space also has a natural slight gradient in places. As the name eludes too, "Pemburgh Jct" the middle uncovered section will comprise of low speed switches. I am looking for a layout with both semi and full automation DCC functionality. I'm planning on operating DCC converted Lima loco's.
Hopefully, I'll be able to achieve great things, still no real rush. I'll post the initial Anyrail6 Track plans once I have been able to fully measure/survey the proposed site (Hopefully Late Oct/Early Nov for initial plans)
Regards
Eddie - Pemburgh Jct