Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 05/14/2021 in all areas

  1. With waiting on the opportunity to get more plywood for the passing loop station I've been concentrating on the boards off the decking and starting to get those covered and track pinned down. So the board for the main running line to go around is cut to shape and braced underneath. To keep it in place there is a prong that goes off under the sidings board and a small prong that comes out from the sidings board. This meant I could finalise the bracing on the sidings board and pin down the roofing felt neatly. I've then finalised the positions of the points and track to the two main sidings and I can now do the soldering and wiring indoors regardless of weather. Once wired it will mean that the line is operational from the sidings to the station area rather than running it off a temporary board with crocodile clip leads supplying power. I'm pleased at the quality of the trackbase so far and flinging coaches along it shows they run well and it is decently flat. Theres only a couple of places I could do with embedding the dropper wires into the aerated blocks. Not having a car at the moment is a bit of a drag. As much as I'd like to live car-free, a trip to B&Q for materials is not so easy on a bike. Though cycling home with an 8-foot strip of wood in my right hand like a medival jousting pole last weekend did result in every car but one (Audi) obeying Highway Code Rule 163!
    1 point
×
×
  • Create New...