Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 04/19/2021 in all areas

  1. Have two lengths of flexi track to complete the first station module, I be working on the next two modules that make up the station complex before I start work on the bus wiring, doing the wiring different to make it easy to trace if I have an issue on the block . The first pic I have the first reverse loop in place, the other be on the last station module, I am making the most of the nice autumn weather, no rain for a week, so full steam ahead, might even be able to run a test loco from the the front platform track to the real platform track. I think I will be powering the single and double cross overs, don't have to bend over be fun, good thing is I can work on two modules at a time . Tony fomr down under keeping on moving ahead
    1 point
×
×
  • Create New...