Like to announce that the bridge construction is now finished at long last, being at it for 5 years trying different designs and came up with my own and wow she worked, still need to modify the bridge piers raising them to 2 feet from 19 inches, easy task.
At the moment I am involved in the Queensland state election , on pre-poll and election day, no work on the bridge and layout till after the election 31st of October, I may get to do some track laying on the bridge the weekend, which I have off . And that will depend on the weather , very overcast and storm predicted today as well, rain tomorrow.
So very happy with the outcome indeed , where the saw horses are is where the piers be going, measurements are 6 inches wide x 2ft x two feet high when modified., the track nails will have to go between the hangers .
The access to inside the arch will have to go on the left side as there be a road bridge on the other side , road bridge be higher than the rail deck , will start work in the hotter months late afternoons, will save on having to make steps and all those hand rails only on the platform entrance..
Tony from down under