Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 06/11/2020 in Posts

  1. So, not that work is out of the way for a week and the weather "isn't too bad", I thought I'd crack on with the rebuilding of Pentney Parkway Station. All four platforms have now been built, all hold a loco + 7. I decided not to make them longer as this starts to involve curved platforms! The sidings have been laid today and the wiring finished. Lessons learnt from the original siding mean that the "Back Road" curves at the end following the main line to avoid going into the back corner where the leaves build up, and only two loco sidings instead of three avoid the tight reverse curve over the pointwork for loco's. Hopefully this weekend will see the return of trains to the layout (Only the 25 out today on track testing!) All platforms now in place awaiting lights and sundries. Sidings now in waiting for buffer stops. 4 Cep on an Up Semi-fast past 47712 on the push/pull set in platforms 3 & 4
    1 point
  2. I thought the same, but I think whats going on is that they've offset some of the cost with the PSU, as that seems rather expensive to me.
    1 point
×
×
  • Create New...