Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 10/22/2019 in all areas

  1. Hi Mick, many thanks yeah sure will I think I will leave the curve the way it is, may be a cutting with a small tunnel to protect the points out in the open , will put the mountain on the back curved deck, the best way to cover the metal hand rails on the balcony , track be going through bottom and middle hand rail, 4 inches be enough clearance. The legs are in place in the lower garden and levelled to the grade quarter inch a foot, had the move the stakes along 5 inches to clear the retaining wall, that will be as far as I will go, next working from the back of the layout hopefully will meet up well and not cutting anything off the curve deck Don't think I get any work done tomorrow, have to work in the back garden trimming a couple of hedges before it gets too hot 33 degrees predicted and rain , will see what it be like Friday, Thursday is out and that is a hot day storm predicted for the afternoon. OH yeah I will be replacing the stakes that hold the bridge down for bigger ones as I ant to drill holes for quarter inch bolts with wing nuts instead of screws, moving along nicely, b on a high hen I link up the decking. Then there is the job of nailing down the track and cutting the brass strips for the decking track joins never ends. Tony from down under keeping on moving ahead
    1 point
×
×
  • Create New...