Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 03/09/2019 in all areas

  1. Hi Mick , thanks yeah the bridge has coma a long way to actually building it and coming together nicely, I am not sure if the arch is too high or not, based it on the Sydney Harbor bridge, with is higher to scale of 4 feet. I may have to replace the hangers down the track finding the best timber to do the job on a budget, the hangers are fence paling,thinking of ply worried of the timber bowing. Have some great ideas for the top of the arch, great jump of for hang gliding , es can get model hang glides in HO scale will be having steps on the arch with handrails of course, be a good view for bridge climbers, ha ,ha.😃 Summer has not left us we are copping 39 degrees Monday and 37 for the next couple of days, I have joined a new train club in the Brisbane western suburbs, 20 minutes from home far better than over an hours drive. Let me know Mick that the arch height is ok I know the cable stay towers are quite tall even higher. Buying more ply midweek and the other arches be cut in full piece, be quicker construction, with the bus the road deck be level with the bottom of the arch be 12 mm's higher. No work on Camdale till it is cooler, cool change coming in Friday and storms from Wednesday, will have to pack up the bridge , don't want it to get wet., bring it into the spare bedroom. Tony from down under.
    1 point
  2. I have finely finished one arch side of one half of the bridge , took me three days, with a few issues along the way, the other three arches that will make up the bridge will be a lot easier using that arch as a template, tomorrow I will screw in place the arch and hangers to the road deck. Hopefully the arch wont bow out of shape, where the hangers are screwed onto the arch I be screwing another plate which will join up on the other side arch, strengthening the bridge. Tomorrow I will set up the circular saw jig to cut the support posts so they be all cut the same length, will cut the post for the other half as well, 24 all up, they line up with the hangers, every 12 inches. We be back to hot weather again the weekend ,Sunday being 36 degrees, there ill be those hot days in Autumn, 33 degrees today, lawn mowing duty this afternoon when it is cooler. The ships second section progress is coming along nicely, after watching Doctor Who season 11 second desc will be working on the ramp access from the top deck, will strengthen up the bulkheads on the top and upper deck. Buying some more off cut ply today for the second arch, hopefully enough to build the transformer cradle. Tony from warm down under
    1 point
×
×
  • Create New...