At long last the days are cooler in the very low 30's now,, two days of summer left, over the last weekend and Monday I made a lot of progress on one half of the main span of the bridge , finishing the frame work of the road deck and cut some supports to clamp the the deck to the rail deck sides.
I only cut the supports using the jigsaw, couldn't get a good cut, will cut some new ones with the power saw setting up the circular saw jig with so I can cut each piece the same length very important, will have to use a bigger clamp so I can screw the support post to the underneath road deck bracket, with I did that way cutting those brackets the same length.
I thing I will have to check the arch hangers, might be too long and will have to remark the arch template on the pergola floor. Having a rest today, joined a new train club yesterday, only 30 minutes away in Brisbane western suburbs, be helping them solder in place those fiber glass brass strips, they are building a layout to put in the Brisbane Train show in May.
The bridge looks twisted because the saw horses are not level , fingers crossed both half's will line up ok, should do .
Tomorrow will made a start on the last sage construction of the layout starting form the car port, I think I will just cut legs to the right height every 3 feet and screw in a hinge to fond the leg a lot quicker.
The bridge will look stunning when finished, some time start on building the arch, once I have finished the bridge and road deck be permanently screwed in place painted with track down, will ask my wife if I can put the two main spans in the spare bedroom.
Tony from nice down under