Hello everyone!
Another sign of life from me.
The last bridge, the one from Italy, is finally being pre-assembled.
I've also replaced overhead line masts in exposed places with more stable self-built ones.
Below is a picture of a portal based on the Danish model.
Apart from that, this was the first winter that passed without structural damage.
Greetings
Thomas