Jump to content
Watch House Tunnel 12
 

Watch House Tunnel 12


mick
 Share


Work began by putting down some simple footings upon which I could start to build. The pathway needed to be at the height indicated by the loosely laid row of bricks in order to gain sufficient clearance for trains below.


From the album:

Construction of Watch House Tunnel

  • 14 images
  • 0 comments
  • 0 image comments

Photo Information for Watch House Tunnel 12

Taken with SAMSUNG GT-I9305

  • 3.7 mm
  • 1/522
  • f f/2.6
  • ISO 80
View all photo EXIF information
 Share


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...