Watch House Tunnel 14
It was the 15th March 2014 when I began work to construct a pathway across the railway tracks to the Koi pond. There had already been damage caused to the tracks beneath by carrying materials across and so a safe method of crossing the rails was desperately needed. In order to construct a pathway across, there would need to be a tunnel beneath through which the railway could pass. This is how things stood from the patio area on that day with just a couple of paving slabs aiding access.
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now